For more search options and additional filters try Advanced Search
Filter by Division, Search for a Section by Name or Number, or use Advanced Search options to search the Current Edition online.
Section 824 - Sewer Lateral Rehabilitation by Cured-In-Place Method

I. GENERAL

1.1 DESCRIPTION OF WORK
1.2 RELATED DOCUMENTS
1.3 SUBMITTALS
1.4 QUALITY CONTROL
1.5 WARRANTY
1.6 DELIVERY, STORAGE AND HANDLING

II. EXECUTION

2.1 EXISTING LATERAL INSPECTION AND PIPE PREPARATION
2.2 BYPASS PUMPING
2.3 CIPP LATERAL LINING INSTALLATION PROCEDURES
2.4 POST-CONSTRUCTION INSPECTION OF COMPLETED WORK
2.5 FINAL ACCEPTANCE
2.6 CLEANUP

III. MEASURMENT FOR PAYMENT

Published: 06/01/2016
Last Modified: 04/06/2017
Attachments: 1 (337 KB)
Title
File Size
Home » Regional Construction Standards » Current Standards » Division 8 - Water and Wastewater Utilities » Section 824 - Sewer Lateral Rehabilitation by Cured-In-Place Method